As you know, building an in-ground pool is never a simple process. Pool builders in Orlando, Florida such as Sparkling Waters Pool Construction, however, are willing to take up this challenge and give you a brand new pool in 12 weeks’ time.
Here’s a look at the step-by-step process for a pool installation in Orlando:
- The Design Stage: 4 Weeks
When you decide that you want to build an in-ground pool, the first step is to design it.
The best swimming pool contractor in Orlando for this is Sparkling Waters Pool Construction which can help you with this.
They are professionals who can design your pool’s 3D model. This usually takes 1 to 4 weeks depending upon the designer’s creativity and experience.
- Permitting: 3 to 4 Weeks
The next step is requesting a permit, which is significant. Nowadays, every state requires permit approval for all constructions. This could take between 2 to 4 weeks, depending upon municipalities.
So, it would help if you approved the permit to build your dream pool by asking for help from your pool contractor in Orlando or your neighbors, city officials, and local professionals for the safety of your pool.
- Week Excavation: 1 Week
Next is the excavation, where most of the work is being conducted underground. Depending on the depth of the pool, the pool builders will create an excavation which will be the foundation for the pool.
Now, depending on how difficult the ground is, the process of excavation usually takes about one week.
- Electrical, Steel, Plumbing: 2 Weeks
After your pool contractor has finished with digging, the next step is to implant the steel, plumbing, and electrical route by checking the water features, lighting spas, etc.
This can take about one to two weeks; depending on your pool size.
- Vinyl, Plastering, Deck, Gunite: 1 to 3 Weeks
Now, the next few weeks will involve some serious plastering. The best pool builders in Orlando Fl. companies such as Sparkling Waters Pool Construction can do a very good job at this stage.
The fiberglass pools and vinyl are built faster than gunite pools, which takes more time and as result, a crew is needed to install this.
The team needs about one to three weeks for this stage, depending on which type of pool you are building.
- Weeks Landscaping, Deck, Custom Features: 1 To 4 Weeks
Now, you are almost at the finish line.
The pool installation in Orlando is now almost done. You need to install landscaping and customs features with the help of pool builders in Orlando, fl.
It usually takes 1 to 4 weeks, depending upon how many features you want to implant.
Total Average Time
So, with that whole process, the total time for a Pool Installation in Orlando will of course depend on a variety of factors such as your budget, and how fast you want the job done.
But choosing Sparkling Waters Pool Construction Company will ensure that this is a speedy process.
Contact us today. The entire pool installation in Orlando can take between 8 and 12 weeks.